No Viable Upgrade Path
Oracle Forms 6i and Reports 6i are end-of-life — traditional upgrades carried high complexity and regression risk with no safe in-place path.
End-of-life Oracle Forms and Reports migrated to a modern stack — alongside PB 5.0 → 2025 upgrade. Zero business disruption.
Oracle Forms 6i and Reports 6i are end-of-life — traditional upgrades carried high complexity and regression risk with no safe in-place path.
End-of-life software receives no security patches or vendor support — every day of continued operation increased compliance and vulnerability risk.
Oracle Forms, Oracle Reports, the legacy database, and PowerBuilder 5.0 were deeply interlinked — modernizing one required modernizing all.
All layers planned together — PB, Oracle Forms, Oracle Reports, and the database — to eliminate hidden incompatibilities and deliver zero-disruption cutover.
Full dependency analysis across PB 5.0, Oracle Forms 6i, Oracle Reports 6i, and the database layer to identify coupling points and migration sequence.
Oracle Forms 6i migrated to modern FullStack Application — logic analysis automated, code generated, UI mapped by FormLift.
Oracle Reports 6i converted to Jasper Reports — template analysis, layout translation, and data source remapping handled by JCT.
Oracle database modernized alongside Forms/Reports to remove the legacy DB dependency and align the full stack.
PowerBuilder 5.0 upgraded to PB 2025 as coordinated final phase — ensuring all layers aligned before cutover.
Migration executed in parallel with live operations throughout — zero business disruption from start to cutover.
"Three end-of-life systems replaced simultaneously — with no disruption to daily operations." — OptiSol DB Modernization Lead
Let's Talk
Tell us what you are running today and where you need expert support.
"*" indicates required fields
Global Presence
Five global locations. One connected engineering team.
North America
Chennai · Coimbatore
Client services
Regional operations
Client services