Space and Segment Health Went Unchecked
Tablespace utilisation, invalid objects, and redo log status were never reviewed on a schedule — problems were discovered only after they had already begun affecting scheduling transactions.
A manufacturing operation's Oracle database supporting plant scheduling and inventory was heading toward a production-halting capacity failure. OptiSol's AWR/ASH-based proactive monitoring surfaced the warning signs weeks in advance — and capacity planning prevented the outage entirely.
Plant scheduling and inventory ran on an Oracle database with no dedicated monitoring — only reactive support after something broke. Tablespace growth, redo log pressure, and segment health were never reviewed until they caused a visible slowdown on the shop floor.
Tablespace utilisation, invalid objects, and redo log status were never reviewed on a schedule — problems were discovered only after they had already begun affecting scheduling transactions.
Without baseline monitoring or alerting thresholds tied to production shift patterns, the team only engaged support once plant operators were already reporting delays.
Storage and compute provisioning followed no trend analysis — the database was heading toward a hard capacity ceiling with no forecast in place to catch it before impact.
OptiSol treated the first weeks of the engagement as an observability project — establishing what "normal" looked like against real production-shift patterns before setting any alerting thresholds.
Stood up custom AWR and ASH-based dashboards tracking tablespace growth, wait events, and session activity aligned to the plant's shift schedule and batch scheduling windows.
Introduced recurring reviews of tablespace headroom, invalid objects, and redo log status — replacing "wait for it to break" with a defined weekly review cadence.
Modelled storage and compute growth trends against historical AWR data, projecting when key tablespaces would hit critical thresholds under current growth rates.
Configured alerting to fire on meaningful deviation from the established baseline — early enough for L2 to plan a change-managed fix, not scramble during a live incident.
Documented the monitoring setup, thresholds, and response procedures, and handed them off — so the client's own team could interpret the dashboards going forward.
"We used to find out about problems when the plant floor called. Now we see the trend line weeks before it would ever have become their problem." — OptiSol Oracle Engineering Lead
Let's Talk
Tell us what you are running today and where you need expert support.
"*" indicates required fields
Global Presence
Five global locations. One connected engineering team.
North America
Chennai · Coimbatore
Client services
Regional operations
Client services