A healthcare claims processing platform needed to demonstrate a credible database exit plan ahead of a compliance audit deadline. O2PIM automated schema and procedure conversion, while OptiSol engineers closed out the CONNECT BY hierarchies and Oracle hints the accelerator flagged as needing judgment — clearing the audit milestone without a rewrite from scratch.

Healthcare Claims Processing O2PIM Compliance-Driven Migration PostgreSQL 16
91%
Schema & PL/SQL conversion automated
120+
CONNECT BY & hinted queries closed by engineers
14 Wks
Duration to audit-ready cutover
The Challenge

An Audit Deadline the Schema Wasn't Ready For

Compliance Pressure

A Fixed Audit Milestone, Not a Flexible One

An upcoming compliance review required the claims platform's operator to show a credible, funded plan to reduce dependence on proprietary database licensing — with a hard date the organization could not negotiate away.

Query Complexity

Hierarchical Logic Baked Into the Schema

Claims adjudication and provider-network lookups relied heavily on Oracle CONNECT BY hierarchical queries, ROWNUM-based pagination, and optimizer hints tuned over years — constructs with no direct one-to-one equivalent in PostgreSQL.

Connectivity

Application Stack Wired to Oracle OCI

Claims intake and adjudication services connected through the Oracle OCI driver with connection pooling tuned specifically to Oracle's session behavior, meaning any migration required re-pointing and re-tuning at the application layer, not just the database.

The Approach

Automated Conversion First, Expert Closure on Every Hierarchical Query

OptiSol used O2PIM to clear the bulk of the schema and procedure conversion automatically, then dedicated engineering time specifically to the CONNECT BY and hint-dependent logic O2PIM correctly flagged rather than guessed at.

Oracle Discovery & O2PIM Scan

O2PIM inventoried the claims schema end-to-end, isolating every CONNECT BY query, ROWNUM pattern, and optimizer hint into a dedicated gap report so the manual-effort scope was known before conversion began.

O2PIM Automated Conversion

Schema DDL, data types, and the majority of PL/SQL packages behind claims intake and eligibility checks were converted automatically to PostgreSQL and PL/pgSQL, reaching 91% automation on this codebase.

Expert Closure on Hierarchical & Hinted Queries

Engineers rewrote CONNECT BY hierarchies as PostgreSQL recursive CTEs, replaced ROWNUM pagination patterns, and re-evaluated query plans where Oracle hints had no PostgreSQL equivalent — validating each rewrite against claims adjudication test cases.

Application Re-pointing From OCI to PostgreSQL

Claims intake and adjudication services were re-pointed from the Oracle OCI driver to the PostgreSQL driver, with pgBouncer introduced and tuned to replace Oracle's native session pooling behavior under equivalent load.

Cutover & 30-Day Post-Migration Support

A staged cutover moved claims traffic to PostgreSQL ahead of the audit date, followed by a 30-day support window using pg_stat_statements to catch query-plan regressions under full production volume.

Audit Milestone Met With a Working Migration, Not a Slide Deck The compliance review was satisfied with a live PostgreSQL cutover already in production, rather than a roadmap promising a future exit.
91% of Conversion Automated by O2PIM The overwhelming majority of schema and procedure objects were converted without manual rewriting, concentrating engineering time on the genuinely complex hierarchical logic.
120+ CONNECT BY and Hinted Queries Closed by Hand Every hierarchical query and optimizer-hint-dependent statement O2PIM flagged was rewritten and validated against claims adjudication logic before cutover was approved.
An Estimated 40% Reduction in Per-Core Licensing Exposure Retiring Oracle across the claims platform is estimated to remove a substantial share of the operator's recurring per-core database licensing spend going forward.
The Impact

The Business Impact

  • Compliance audit milestone met with a production PostgreSQL cutover ahead of the deadline
  • 91% of schema and PL/SQL conversion automated by O2PIM on a hierarchical-query-heavy schema
  • 120+ CONNECT BY, ROWNUM, and Oracle-hint constructs rewritten and validated by engineers
  • Claims intake and adjudication services re-pointed from Oracle OCI driver to PostgreSQL driver
  • pgBouncer connection pooling tuned to match prior Oracle session-handling performance
  • 30-day post-migration support window used pg_stat_statements to resolve query-plan regressions early
"The hierarchical queries were the part everyone assumed would blow the timeline. Having O2PIM isolate exactly which ones needed a human meant we spent our time only where it mattered." — OptiSol Oracle Engineering Lead

Let's Talk

Start a Conversation

Tell us what you are running today and where you need expert support.

"*" indicates required fields

Free initial consultation Confidential assessment solutions@optisolbusiness.com

Global Presence

Where We Operate

Five global locations. One connected engineering team.

New York skyline representing the United States office
HQ

United States

North America

India landmark representing the delivery centre
Delivery Hub

India

Chennai · Coimbatore

London skyline representing the United Kingdom office
Europe

United Kingdom

Client services

Australian coastline representing the Australia office
APAC

Australia

Regional operations

Dubai skyline representing the UAE office
Middle East

UAE

Client services